Coastal flooding results from a number of factors:
Storm surges - a rapid rise in sea level caused by really low-pressure storms (e.g. tropical storm)
Storm tides - occur when there is a combination of high tide and low-pressure storm
Tsunamis - large sea waves due to underwater earthquakes. The closer to the coast, the bigger the impact
King tides
Sea level rise due to global warming
High river discharge after a storm - when combined with a spring tide, water in the estuary cannot discharge into the sea causing a backflow of water and flooding
The worst flooding arises from a combination of any of these
The biggest impacts are felt by emerging countries, although the biggest economic cost is are to developed countries
Prediction & Prevention of Flooding
Prediction
Early warning systems allow communities to prepare (evacuate or take shelter) before flooding occurs
Two methods are used to help forecast coastal flooding:
Past records (diaries, newspapers, government/council records etc)
These will identify areas that are at high risk of flooding and their frequency
Modern technology - GIS, satellite and computer monitoring, weather stations (local and national) etc
These allow for forecasting and tracking potential hazard events i.e.
Tropical storms - track the storm's path and associated storm surge
Earthquakes - size and position if underwater and possible tsunami outcome
Both these methods of forecasting help officials to say when and where the event will occur
It indicates the possible strength and scale of the flooding, and the likelihood of damage and death
Prevention
Prevention is about taking action that reduces or removes the risk of coastal flooding
Actions include:
Flood defences
These are built along high-risk stretches of coast
Emergency centres
Centrally placed on higher ground where people can be safe from flooding
Early warning systems
Allows for preparation or evacuation of an area
Education
Informing local people on what to do if and when a flood occurs
Planning
Planning any new development away from high-risk-areas
Designing buildings to cope with low levels of flooding
Elevating buildings so that flood waters can pass underneath
Flood proof buildings with raised foundations (fixed or mechanical)
Reinforced barriers
Dry flood proofing - sealing a property so that floodwater cannot enter
Wet flood proofing - allows some flooding of the building
Buffer zones
Areas of land are allowed to flood before reaching settlements
This allows the energy in the surge to dissipate slowing down the distance the floodwater will travel
It can mean moving people away from the coast which could be controversial